EasyManua.ls Logo

Trane 4WHC3024 User Manual

Trane 4WHC3024
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
XE1200
2, 2-1/2, 3, 3-1/2 Tons Shown
Installer's Guide
Single Packaged Heat Pump
13 SEER, Over/Under
2, 2-1/2, 3, 3-1/2, 4, & 5 Ton, R-410A
18-BB36D1-4
4WHC3-IG-4
WARNING:
HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE
CAPACITORS BEFORE SERVICING
© 2011 Trane
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
Important This Document is customer property. Please return to service information pack and give this Installer's Guide to the homeowner
upon completion of work.
Question and Answer IconNeed help?

Do you have a question about the Trane 4WHC3024 and is the answer not in the manual?

Trane 4WHC3024 Specifications

General IconGeneral
Cooling Capacity24000 BTU/H
HSPF8.2
Voltage208/230V
Phase1
RefrigerantR-410A
Heating Capacity24000 BTU/h

Summary

Safety Considerations

General Safety Hazards

Covers risks from high voltage, moving fans, combustible gas, and hot surfaces.

Refrigerant and Pressure Safety

Emphasizes safe handling of R-410A refrigerant and high-pressure systems.

Grounding and Electrical Precautions

Stresses proper grounding, disconnects, and wiring tightness.

Step 2: Determine Unit Clearances

Critical Unit Dimensions and Clearances

Illustrates critical dimensions and provides installation/service clearance requirements for the unit.

Step 4: Unit Installation

Ground Level Installation Procedure

Provides step-by-step instructions for installing the unit on a ground-level pad.

Electrical Wiring

Connections, Grounding, and Power Supply

Covers electrical connections, grounding, power wiring, and disconnect switch installation.

Overcurrent Protection and Wire Sizing

Details branch circuit protection, wire sizing, and insulation requirements.

Starting the Unit

Pre-Start Checklist and Initial Startup

A checklist for verifying installation readiness before initiating cooling or heating startup.

Cooling and Heating Operation and Shutdown

Steps for starting, operating, and shutting down the unit in both cooling and heating modes.

Sequence Of Operation

Final Installation Checklist

Pre-Operation System Verification

A checklist to confirm unit operation, fan/compressor function, voltage, and system balance.

Defrost Control Operation

Related product manuals