EasyManua.ls Logo

Trane 4YCZ5048E1115A User Manual

Trane 4YCZ5048E1115A
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
February 2023
1188--EEBB4411DD11--11BB--EENN
Single Packaged Gas/Electric 15 SEER2 Convertible,
2 - 5 Ton, 60 - 115 KBTU, R-410A
4YCZ5024F1060A
4YCZ5036F1070A
4YCZ5036F1090A
4YCZ5048E1090A
4YCZ5048E1115A
4YCZ5060E1115A
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
NNoottee:: “Unit specific Service Facts available online.”
Installation and Operations Manual
Question and Answer IconNeed help?

Do you have a question about the Trane 4YCZ5048E1115A and is the answer not in the manual?

Trane 4YCZ5048E1115A Specifications

General IconGeneral
Model4YCZ5048E1115A
CategoryChiller
TypeAir-Cooled
Compressor TypeScroll
RefrigerantR-410A

Summary

Introduction, Unit Inspection and Specification

Product Specifications

Details unit specifications including cooling, heating, compressor, and coil data for various models.

Charging in Cooling above 55°F OD Ambient

Procedure for checking and adjusting refrigerant charge based on liquid line temperature and pressure.

Determine Unit Clearances

Provides recommended service and combustible material clearances for unit installation.

Unit Installation

Gas Piping Installation

Safety warnings and procedures for connecting gas piping, including pressure checks.

Electrical Wiring

Safety warnings and guidelines for connecting electrical power and wiring to the unit.

Power Wiring

Details on running power supply lines, conduit, and making high-voltage connections.

Control Wiring (Class II)

Guidelines for routing and connecting low-voltage thermostat and control wiring.

Unit Startup

Pre-Start Quick Checklist

A comprehensive checklist for ensuring all installation steps are completed before unit startup.

Operating Pressure Checks

Instructions for checking system pressures and comparing them to service facts for proper operation.

Maintenance

Manifold Pressure Check and Adjust

Procedure for checking and adjusting gas manifold pressure for optimal burner performance.

Pressure Curves

Troubleshooting Chart

Related product manuals