© Trane 2013
CGWH-SVX01D-E4
General information
Foreword
These instructions are given as
a guide to good practice in the
installation, start-up, operation, and
maintenance by the user, of Trane
CGWH/CCUH chillers. They do not
contain full service procedures
necessary for the continued
successful operation of this
equipment. The services of a
qualified technician should be
employed through the medium of a
maintenance contract with a reputable
service company. Read this manual
thoroughly before unit start-up.
Units are assembled, pressure tested,
dehydrated, charged and run tested
before shipment.
Warnings and cautions
Warnings and Cautions appear at
appropriate sections throughout this
manual. Your personal safety and
the proper operation of this machine
require that you follow them
carefully. The constructor assumes
no liability for installations or
servicing performed by unqualified
personnel.
WARNING! : Indicates a potentially
hazardous situation which, if not
avoided, could result in death or
serious injury.
CAUTION! : Indicates a potentially
hazardous situation which, if not
avoided, may result in minor or
moderate injury. It may also be used
to alert against unsafe practices or
for equipment or property-damage-
only accidents.
Safety recommendations
To avoid death, injury, equipment
or property damage, the following
recommendations should be
observed during maintenance and
service visits:
1. The maximum allowable pressures
for system leak testing on low and
high pressure side are given in the
chapter “Installation”. Always provide
a pressure regulator.
2. Disconnect the main power supply
before any servicing on the unit.
3. Service work on the refrigeration
system and the electrical system
should be carried out only by
qualified and experienced personnel.
Reception
On arrival, inspect the unit before
signing the delivery note.
Reception in France only:
In case of visible damage:
The consignee (or the site
representative) must specify any
damage on the delivery note,
legibly sign and date the delivery
note, and the truck driver must
countersign it. The consignee (or the
site representative) must notify Trane
Epinal Operations - Claims team and
send a copy of the delivery note.
The customer (or the site
representative) should send a
registered letter to the last carrier
within 3 days of delivery.
Note: for deliveries in France, even
concealed damage must be looked
for at delivery and immediately
treated as visible damage.
Reception in all countries except
France:
In case of concealed damage: The
consignee (or the site representative)
must send a registered letter to the
last carrier within 7 days of delivery,
claiming for the described damage.
A copy of this letter must be sent
to Trane Epinal Operations - Claims
team.