EasyManua.ls Logo

Trane CVGF500 User Manual

Trane CVGF500
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Gear-Driven Centrifugal
Water-Cooled Liquid
Chillers with
AdaptiView Controls
X39641150010
CVGF-SVX03B-EN
Unit Model
CVGF 400-1000 Ton Units
(50 and 60 Hz)
Installation
Operation
Maintenance Manual
Question and Answer IconNeed help?

Do you have a question about the Trane CVGF500 and is the answer not in the manual?

Trane CVGF500 Specifications

General IconGeneral
BrandTrane
ModelCVGF500
CategoryChiller
LanguageEnglish

Summary

Installation: Electrical

Power Supply and Wiring

Guidelines for connecting the 3-phase power supply, wiring, and conduit.

Starter to Motor and UCP Wiring

Procedures for connecting the starter to the motor and the unit control panel.

Control System Components

Water Flow Interlock Circuits

Description of chilled and condenser water flow interlock circuits for safety.

Machine Protection and Adaptive Control

Power Loss and Overload Protection

Protection mechanisms against momentary power loss and motor overloads.

Current Limit and Phase Loss Protection

Motor protection against current limits, phase loss, and reverse rotation.

Temperature and Pressure Limits

Safety limits related to evaporator and condenser temperatures and pressures.

Unit Startup

Pre-Commissioning Bump Start Procedure

Critical procedure before the first chiller start to prevent damage.

Periodic Maintenance

Leak Testing and Oil Management

Procedures for leak testing, oil sampling, and compressor oil removal.

Oil Charging and Filter Replacement

Steps for charging oil, replacing the oil filter, and system vacuum procedures.

Refrigerant Charging

Procedures for system evacuation, dehydration, and refrigerant charging.

Related product manuals