Installation: Mechanical
Clearances
Provide enough space around the unit to allow the installation and maintenance per-
sonnel unrestricted access to all service points. Refer to submittal drawings for the
unit dimensions.
Allow adequate clearance for condenser and compressor servicing. A minimum of 36"
(914 mm) is recommended for compressor service and to provide sufficient clearance
for the opening of control panel doors. Refer to Figures 13 and 14, Tables 7 and 8 for
minimum clearances required for condenser tube service. In all cases, local codes will
take precedence over these recommendations.
Notes: Required vertical clearance above the unit is 36" (914 mm). There should be
no piping or conduit located over the compressor motor. If the room configuration
requires a variance to the clearance dimensions, contact your Trane sales office repre-
sentative.