EasyManua.ls Logo

Trane RTAC 130

Trane RTAC 130
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Model RTAC 120-400 (50 Hz)
400-1500 kW
Installation
Operation
Maintenance
RLC-SVX02G-E4
Series R™ Air-Cooled Helical-Rotary
Liquid Chiller

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RTAC 130 and is the answer not in the manual?

Trane RTAC 130 Specifications

General IconGeneral
BrandTrane
ModelRTAC 130
CategoryChiller
LanguageEnglish

Summary

Installation Operation Maintenance

General Information

Unit Inspection

Inspect the unit for shipping damage and shortages upon arrival. Report damage to the carrier.

General Data

Installation - Mechanical

Installation Responsibilities

Contractor duties for installing the RTAC unit according to manual sections.

Special Lifting and Moving Instructions

Recommended method for lifting and moving the unit safely.

Foundation

Requirements for a rigid, non-warping foundation to support unit loading.

Installation - Electrical

Wire Sizing

Guidelines for selecting appropriate wire sizes for unit connections.

Power-Supply Wiring

Requirements for sizing and selecting power-supply wiring.

Interconnecting Wiring

Details on wiring for pump interlock and external controls.

Operating Principles

Pre-Start Checkout

Installation Checklist

Verify installation, location, piping, and shipping status before startup.

General

General pre-start checks including wiring, valves, voltage, phasing, and water.

Unit Voltage Power Supply

Verify supply voltage meets criteria and is within range.

Unit Voltage Imbalance and Phasing

Check voltage imbalance and phase sequence for motor rotation.

Unit Startup Procedures

Daily Unit Startup

Sequence of operations for starting the unit daily.

Seasonal Unit Startup Procedure

Procedures for starting the unit after seasonal shutdown.

System Restart After Extended Shutdown

Steps to restart the unit after a long period of inactivity.

Unit Shutdown Procedures

Maintenance Procedures

R134 a Field-Charging Procedure

Procedure for adding refrigerant charge to the unit.

Charge Isolation in the high or low side of the system

Procedure for isolating refrigerant charge for maintenance.

Filter Replacement Procedure

Procedure for replacing the refrigerant filter element.

Related product manuals