Do you have a question about the Trane RTAC 130 and is the answer not in the manual?
Inspect the unit for shipping damage and shortages upon arrival. Report damage to the carrier.
Contractor duties for installing the RTAC unit according to manual sections.
Recommended method for lifting and moving the unit safely.
Requirements for a rigid, non-warping foundation to support unit loading.
Guidelines for selecting appropriate wire sizes for unit connections.
Requirements for sizing and selecting power-supply wiring.
Details on wiring for pump interlock and external controls.
Verify installation, location, piping, and shipping status before startup.
General pre-start checks including wiring, valves, voltage, phasing, and water.
Verify supply voltage meets criteria and is within range.
Check voltage imbalance and phase sequence for motor rotation.
Sequence of operations for starting the unit daily.
Procedures for starting the unit after seasonal shutdown.
Steps to restart the unit after a long period of inactivity.
Procedure for adding refrigerant charge to the unit.
Procedure for isolating refrigerant charge for maintenance.
Procedure for replacing the refrigerant filter element.