Trane RTAC 170 User Manual

Trane RTAC 170
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Model RTAC 120-400 (50 Hz)
400-1500 kW
Installation
Operation
Maintenance
RLC-SVX02G-E4
Series R™ Air-Cooled Helical-Rotary
Liquid Chiller

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RTAC 170 and is the answer not in the manual?

Trane RTAC 170 Specifications

General IconGeneral
ModelRTAC170
RefrigerantR-134a
Phase3
Cooling Capacity170 tons
Compressor TypeScrew
Voltage Options380V
Sound Power Level85 dBA

Summary

General Data

Installation - Mechanical

Installation Responsibilities

Contractor tasks for installing RTAC unit per manual sections and local codes.

Installation - Electrical

Wire Sizing

Guidelines for selecting appropriate wire sizes for electrical connections.

Power-Supply Wiring

Requirements for sizing and selecting power-supply wiring according to standards.

Chilled-Water Flow (Pump) Interlock

Details on flow proving switch and auxiliary contacts for pump control.

Emergency Stop

CH.530 provides control for customer-installed emergency stop.

Electrical Data

Pre-Start Checkout

Installation Checklist

A checklist to verify all installation procedures are completed before unit startup.

Unit Voltage Power Supply

Verify supply voltage meets criteria and is within range.

Unit Voltage Imbalance

Checks for excessive voltage imbalance to prevent motor overheating.

Unit Voltage Phasing

Verifies correct phase sequence (A-B-C) to prevent equipment damage.

Water-System Flow Rates

Ensure balanced chilled-water flow within specified minimum and maximum values.

Unit Startup Procedures

Daily Unit Startup

Sequence of operation for starting the chiller, including external events and responses.

General

Steps to follow after pre-start checkout for unit startup.

Seasonal Unit Startup Procedure

Steps for starting the unit after seasonal shutdown.

System Restart After Extended Shutdown

Procedures to restart the unit after a period of extended shutdown.

Periodic Maintenance

Maintenance Procedures

R134a Field-Charging Procedure

Procedure for adding R-134a refrigerant charge to the unit.

Field Oil-Charging Procedure

Procedure for initial oil charging under specific circumstances.