Do you have a question about the Trane RTAC 200 and is the answer not in the manual?
Contractor's duties for installing the RTAC unit, including foundation, piping, and wiring.
Specific recommendations for lifting and moving the unit, including sling and spreader bar requirements.
Steps to protect the chilled-water system from freezing during subfreezing ambient temperatures.
Important warnings and guidelines for electrical installation, including wiring compliance and material use.
Guidelines for selecting appropriate wire sizes for unit power supply connections.
Checklist of procedures to verify before unit startup, covering receiving, location, piping, and wiring.
Pre-start procedures to review and verify, including electrical, refrigerant valves, and voltage checks.
Procedures for starting the unit after a seasonal shutdown, including valve checks and system filling.
Importance of proper oil and refrigerant charge for unit operation, performance, and environmental protection.