EasyManua.ls Logo

Trane RTAD 150 HE User Manual

Trane RTAD 150 HE
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
Operation
Maintenance
RTAD-SVX01F-E4
Series R™ Air-Cooled Helical Rotary
Liquid Chiller
RTAD 085 - 180 (50Hz)
Standard, Free Cooling and Heat
Recovery models

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RTAD 150 HE and is the answer not in the manual?

Trane RTAD 150 HE Specifications

General IconGeneral
BrandTrane
ModelRTAD 150 HE
CategoryChiller
LanguageEnglish

Summary

General Information

Warnings and Cautions

Explains the meaning of WARNING and CAUTION symbols used in the manual.

Installation - Mechanical

Installation Responsibilities

Contractor's responsibilities during unit installation.

Freeze Protection

Methods to protect the unit from freezing.

Installation - Electrical

General Recommendations

General advice and warnings for electrical installation.

Power Supply Wiring

Guidelines for sizing and selecting power supply wiring.

Chilled Water Flow (Pump) Interlock

Wiring for chilled water pump flow proving interlock.

External Emergency Stop

Wiring for an external emergency stop function.

Unit Start-up Procedures

Daily Unit Start-Up

Procedure for starting the unit daily.

Seasonal Unit Start-Up Procedure

Procedure for seasonal unit start-up.

System Restart After Extended Shutdown

Procedures to restart the unit after a prolonged shutdown.

Unit Shutdown Procedures

Procedures for shutting down the unit.

Extended Shutdown Procedure

Procedure for extended shutdown.

Maintenance Procedures

Refrigerant Emission Control

Procedures to minimize refrigerant emissions.

Refrigerant and Oil Charge Management

Importance of proper refrigerant and oil charge.

R134a Field Charging Procedure

Specific procedure for field charging R134a refrigerant.

Refrigerant Charging

Monitoring and adjusting refrigerant charge.

Isolating the Refrigerant in the High Pressure Side

Procedure to isolate refrigerant on the high-pressure side for repairs.

Isolating the Refrigerant in the Low Pressure Side

Procedure to isolate refrigerant on the low-pressure side for repairs.

Adding Refrigerant

Steps to add refrigerant to recharge the unit.

Refrigerant Filter Changing Procedure

Procedure for changing the refrigerant filter.

Oil Charging Procedure

Procedures for charging oil into the system.

Factory (initial) Oil Charging Procedure

Procedure for initial oil charging of new or serviced units.

Field Oil Charging Procedure

Procedure for field charging oil into the unit.

Evaporator Heat Tape Checkout Procedure

Procedure to check the evaporator heat tape.

Safety Recommendations

Safety advice for maintenance and service visits.

Pre-Start Checkout

Electrical Wiring

Verifying power supply, phase, and connections before starting.

Unit Voltage Phasing

Ensuring correct phase sequence to prevent equipment damage.

Related product manuals