Do you have a question about the Trane RTAD 100 and is the answer not in the manual?
Lists the general tasks and requirements for contractors installing the RTAD unit.
Covers unit water piping, including connections, valves, strainers, and general piping components.
Provides essential warnings and guidelines for all electrical wiring and connections.
Details requirements for sizing and selecting power supply wiring and disconnect switches.
Explains wiring for pump interlocks, control contacts, and system integration.
Explains how to configure external chilled-water setpoints and current limit setpoints.
Illustrates the system and oil schematic for standard and partial heat recovery units.
Presents the system schematic diagram specifically for free-cooling units.
Shows the system schematic diagram for total heat recovery units.
A comprehensive checklist to ensure all installation procedures are completed before unit start-up.
Covers flushing, connecting, and checking all unit piping and water system components.
Verifies all electrical connections, power supply, and control wiring for proper installation.
Describes the sequence of operations for a typical daily chiller start-up.
Explains the importance of proper refrigerant and oil charge for unit operation and performance.
Provides a step-by-step guide for charging the unit with R134a refrigerant.
Reiterates safety precautions to be observed during maintenance and service visits.