Do you have a question about the Trane S8X2B080M4PSBA and is the answer not in the manual?
Warnings regarding fire or explosion risks from gas leaks, improper handling, and testing.
Warnings about carbon monoxide poisoning due to improper venting or system issues.
Warnings about electrical hazards including shock, fire, and explosion during servicing.
Hazards related to installation in confined spaces, bypassing safety switches, and manual lighting.
Hazards during servicing, including power discharge, component contact, and blower door safety.
Hazards related to installation in mobile housing and during electrical/fuel failures.
Hazards from flammable storage, gas connectors, corrosive atmospheres, and flooring.
Safety related to high voltage, moving parts, filter placement, and overheating.
Prohibitions and inspection requirements for furnace venting and chimney liners.
Essential safety practices and precautions for furnace installation, servicing, and operation.
Checks before start-up: sealing, filters, venting, panel installation.
Procedure for checking and adjusting control and safety switches.
Control system menu flow for S8B1/S8X1 single stage outdoor units.
Procedures for system setup, changing defaults, and clearing last 6 faults.
How to select cooling/HP and gas heating fan speeds using the control menu.
Control system menu flow for S8X1 two stage outdoor units.
Procedure for selecting cooling/HP fan speeds for 2-1 ODU.
Procedure for selecting gas heating fan speeds.
Control system menu flow for S8X2 single stage outdoor units.
Setup and fault clearing procedures for S8X2 single stage OD units.
Selecting cooling/HP and gas heating fan speeds for S8X2 units.
Control system menu flow for S8X2 two stage outdoor units.
Selecting cooling/HP and gas heating fan speeds for S8X2 two stage units.
Procedure for entering and executing the Run Test Mode.
Step-by-step sequence for 1st stage gas heating operation.
Step-by-step sequence for 2nd stage gas heating operation on S8X2 models.
Detailed sequences for 1st and 2nd stage gas heating, including safety checks.
Step-by-step sequence for single stage cooling operation.
Step-by-step sequence for two stage cooling operation.
Procedure for setting airflow using the 9-tap motor and external static pressure.
Table of alarm error codes and their corresponding explanations.
Procedure to view the last 6 faults and clear them.