PKG-SVX14A-EN
Installation, Operation, and
Maintenance
Midrange Self-Contained Units
October 2008
Models SCWH/SCRH
3, 5, 7.5, 10, 12, & 15-tons
“AO” and later design sequence
Question and Answer IconNeed help?

Do you have a question about the Trane SCRH and is the answer not in the manual?

Trane SCRH Specifications

General IconGeneral
SEER RatingUp to 18
HSPF RatingUp to 10
Refrigerant TypeR-410A
Voltage208/230V
Phase1
Warranty10-year limited warranty on compressor and outdoor coil

Summary

General Information

About This Manual

Details the manual's scope and history for specific models.

Warnings and Cautions

Explains safety symbols and provides examples of warnings and cautions.

Common HVAC Acronyms

Lists and defines common acronyms used in HVAC.

Refrigerant Emissions Note

Discusses environmental impact and conservation of refrigerants.

Installation: Model Description

Model Number Description

Explains the components of the model number for unit identification.

Unit Airflow Configurations

Illustrates and describes different unit airflow configurations.

Installation: Unit Details

General Unit Overview and Components

Overview of unit construction, circuits, evaporator, and controls.

Field-Installed Accessories and Nameplate

Lists accessories and explains the unit nameplate.

Refrigerant Handling Procedures

Procedures for safe and responsible refrigerant handling.

Pre-Installation Considerations

Pre-Installation Checklist

A checklist for verifying all prerequisites before installation.

Receiving and Handling Procedures

Procedures for receiving, inspecting, and storing the unit.

Service Access and Installation Preparation

Specifies clearances and outlines steps to perform before installation.

Service Access Diagrams

Service Access Diagrams (3-7.5 Ton Units)

Diagrams showing service access points for smaller unit sizes.

Service Access Diagrams (10-15 Ton Units)

Diagrams showing service access points for larger units.

Service Access Diagrams (Continued)

Service Access Diagrams (10-15 Ton Units - Top Fan)

Diagrams showing service access points for larger units with top fan config.

Service Access Diagrams (10-15 Ton Units - Side Fan)

Diagrams showing service access points for units with side-mounted fan configurations.

Isolator Placement and Lifting

Isolator Placement Guidelines

Provides load points and types for isolators.

Isolator Mounting Hole Locations (3-7.5 Ton)

Diagrams for isolator placement on smaller units.

Isolator Mounting Hole Locations (10-15 Ton)

Diagrams for isolator placement on larger units.

Unit Lifting Procedure

Proper Unit Lifting Procedure

Instructions and diagram for safely lifting the unit.

Dimensions and Weights (3 & 5 Tons)

Unit Dimensions and Weights (3 & 5 Tons)

Diagrams and table for 3 and 5-ton unit dimensions and weights.

Dimensions and Weights (7.5 Tons)

Unit Dimensions and Weights (7.5 Tons)

Diagrams and table for 7.5-ton unit dimensions and weights.

Dimensions and Weights (10-15 Tons - Top Fan)

Unit Dimensions and Weights (10-15 Tons - Top Fan)

Diagrams and table for 10-15 ton units with top fan config.

Dimensions and Weights (10-15 Tons - Side Fan)

Unit Dimensions and Weights (10-15 Tons - Side Fan)

Diagrams and table for 10-15 ton units with side fan config.

Accessory Dimensions and Weights

Plenum Dimensions and Weight

Dimensions and weight for the plenum accessory.

Hot Water Coil Dimensions (3 & 5 Tons)

Dimensions and weights for hot water coils on 3 & 5-ton units.

Accessory Dimensions and Weights (Continued)

Hot Water Coil Dimensions (7.5 Tons)

Dimensions and weights for hot water coils on 7.5-ton units.

Hot Water Coil Dimensions (10-15 Tons)

Dimensions and weights for hot water coils on 10-15 ton units.

Mechanical Requirements

Duct Connection Guidelines

Guidelines for installing air ductwork according to standards.

Water Piping Connections

Instructions for condenser and condensate piping connections.

Cooling Tower Piping Considerations

Notes on cooling tower control and piping.

Water Temperature Requirements

Details on water regulating valve installation and operation.

Mechanical Requirements (Continued)

Refrigerant Piping (Air-Cooled Units)

Procedures for air-cooled unit refrigerant piping.

Brazing Procedures for Piping

Essential techniques for making sweat connections.

Electrical Requirements Overview

Guidelines for ensuring correct electrical requirements at the site.

Unit Wiring Diagrams Location

Location of unit wiring diagrams for connections and analysis.

Electrical Requirements

Supply Power Wiring Responsibility

Installer's responsibility for providing power supply wiring.

Electrical Data Calculation Formulas

Formulas and definitions for electrical data.

Voltage Range and Imbalance

Acceptable voltage range and imbalance tolerance.

Electrical Requirements (Continued)

Model SCWH/SCRH Electrical Data Table

Table providing electrical data for various models.

Installation Procedure

Installation Completion Checklist

A checklist to verify all installation steps are complete.

General Unit Installation Requirements

Requirements for ductwork, shipping damage, and electrical connections.

Field Control Wiring (Optional)

Notes on field-installed control wiring compliance.

Fan Discharge Conversion Procedure

Steps to convert fan discharge from vertical to horizontal.

Plenum Installation Instructions

Instructions for installing the plenum and accessory bag.

Pre-Startup Requirements

Pre-Startup Verification Checklist

Checklist to verify installation completion before unit startup.

Unit Location and Mounting Checks

Ensures unit location meets requirements and covers mounting.

Component Overview Checks

Checks for fan/motor alignment, belt tension, filters, and fan rotation.

Ductwork Verification

Verification of ductwork compliance with standards.

Startup Procedures

Unit Startup Procedures

Steps to check before initiating unit startup.

Unit Startup Checklist

A checklist for the startup sequence and initial operation.

Operation: Sequence of Operation

Sequence of Operation Explained

Explains how the thermostat and fan switch control unit operation.

Maintenance: General Data

Midrange Maintenance Data Table

Table containing general maintenance data for midrange units.

Maintenance Procedures

Specific Maintenance Procedures

Specific procedures for normal maintenance program.

Periodic Maintenance Checklist

Checklist for monthly and seasonal maintenance tasks.

Condenser Coil Cleaning

Procedures for cleaning outdoor condenser coils.

Refrigerant System Maintenance

Refrigerant Emissions Control and Handling

Special notes on refrigerant emissions and handling.

Confined Space and Explosion Hazards

Warnings about working in confined spaces and explosion risks.

Leak Testing and Refrigerant Evacuation

Guidelines for leak testing and evacuating refrigerant systems.

Compressor and Charging Procedures

Compressor and Motor Winding Precautions

Cautions regarding compressor motor windings and damage.

Refrigerant System Charging

Steps for completely charging the refrigerant system.

Operation and Controls Data

Tables for normal operating conditions and controls adjustments.

Periodic Checklists

Monthly and Semi-Annual Maintenance Tasks

Overview of monthly and semi-annual maintenance tasks.

Belt Tension Adjustment Procedure

Diagram and steps for adjusting belt tension.

Troubleshooting Guide

Unit Troubleshooting Overview

Steps and procedures to correct common problems.

Unit Non-Operation Troubleshooting

Troubleshooting steps for a non-operating unit.

Fan Operation, Compressor Non-Start Troubleshooting

Troubleshooting steps for fan running but compressor not starting.

Unit Safety Control Troubleshooting

Troubleshooting steps when unit is held off by safety controls.

Noisy Operation Troubleshooting

Troubleshooting steps for noisy unit operation.

Troubleshooting (Continued)

Insufficient Cooling Troubleshooting

Troubleshooting steps for insufficient cooling.

Unit Short Cycling Troubleshooting

Troubleshooting steps for units that short cycle.

Compressor Runs, Fan Not Running Troubleshooting

Troubleshooting steps when compressor runs but fan does not.

Typical Wiring Diagrams

Wiring Diagram SCWH/SIWH 030-050-075 Three Phase

Wiring diagram for SCWH/SIWH 030/050/075 3-phase models.

Typical Wiring Diagrams (Continued)

Wiring Diagram SCRH/SIRH 100-120-150 Three Phase

Wiring diagram for SCRH/SIRH 100/120/150 3-phase models.

Typical Wiring Diagrams (Continued)

Wiring Diagram SCWH/SIWH 100-120-150 Three Phase

Wiring diagram for SCWH/SIWH 100/120/150 3-phase models.

Typical Wiring Diagrams (Continued)

Wiring Diagram SCWH/SIWH 030-050-075 Three Phase (Alternate)

Alternate wiring diagram for SCWH/SIWH 030/050/075 3-phase models.