28
18-GJ06D2-2A
Important: Do not open the service valves until the refrigerant lines
and indoor coil leak check and evacuation are complete.
8. Evacuate until the micron gauge reads no higher than 350
microns, then close off the valve to the vacuum pump.
0350
Microns
ON
OFF
9. Observe the micron gauge. Evacuation is complete if the micron
gauge does not rise above 500 microns in one (1) minute.
a. Once evacuation is complete blank off the vacuum pump and
micron gauge, and close the valves on the manifold gauge
set.
Note: Charge system using Outdoor unit’s Installer Guide or Service
Facts.
Note: Ensure to wipe any refrigerant oil off the panels.
1 MIN.
10. Replace the Line Set panel.
a. Allow time for tubing to cool.
b. Install grommets to line set piping in orientation shown.
c. Allow time for tubing to cool.
d. Install grommets to line set piping in orientation shown.
Note: A slight amount of dish soap can be used to aid in the
installation of the grommets. Remove any excess from the
tubing and grommet after the grommet is installed.
SEE ENLARGED
ILLUSTRATION FOR ORIENTATION
RReeffrriiggeerraanntt LLiinnee BBrraazziinngg