18-GJ06D2-2A
5
Unit Design
Table 1. Cabinet Penetration
Important: Due to the unique design of this unit, which allows the
electrical wiring to be routed within the insulation, do not
screw, cut, or otherwise puncture the unit cabinet in any
location other than the ones illustrated.
Important: Under no conditions should metal strapping be attached
to the unit to be used as support mechanisms for
carrying or suspension purposes.
Screws can be
drilled into bottom of
unit. (1/2 m ax.
screw length)
(Typical all sides)
Screws, saw cuts,
and other penetra-
tions are allowed
in the blower
section for
installation of Side
Ret
urn Kit.
Screws are allowed up to 3- 3/4
from the top of the cabinet
(heater com partment).
(Typical both sides)
Screws for flange
k
i
t
attachm ent are allow
ed
along the interior of
the cabinet (see arrows)
(Typical all sides)
No penetrations
allowed.
(Typical all sides)
Screws allowed only
in the first 3/4 of
front bottom of unit
(in cross m em ber)
Table 2. Panel Removal
The unit contains four (4) access panels: Blower/Filter, Coil, Line Set,
and Heater.
The Blower/Filter panel is removed using 1/4 turn thumb screws.
1. Turn thumb screws on Blower/Filter panel.
2. Pull top of panel out, away from cabinet.
3. Lift panel up out of channel.
4. Set aside.