Trane TTA200BD series User Manual

Trane TTA200BD series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
Operation
Maintenance
Split System Cooling Condensers
7 1/2 - 20 Tons
September 2004
Models:
(60 Hz)
TTA090A***F
TTA120A***F
TTA120B***E
TTA120C***G
TTA150B***E
TTA180B***F
TTA180C***G
TTA240B***F
TTA-SVX02C-EN
18-AC60D8-1
(50 Hz)
TTA075AD**F
TTA085AD**F
TTA100AD**F
TTA100BD**E
TTA100CD**G
TTA125BD**E
TTA155BD**F
TTA155CD**G
TTA200BD**F
Question and Answer IconNeed help?

Do you have a question about the Trane TTA200BD series and is the answer not in the manual?

Trane TTA200BD series Specifications

General IconGeneral
BrandTrane
ModelTTA200BD series
CategoryAir Conditioner
LanguageEnglish

Summary

Installation Operation Maintenance

Split System Cooling Condensers

Overview of split system cooling condenser units.

Unit Dimensions

Electrical Data

Installation

Initial Leak Test

Procedure to check for leaks in the refrigerant circuits.

Leak Check and System Evacuation

Procedures for checking leaks and evacuating the system.

Electromechanical Field Wiring

Typical field wiring for electromechanical controls.

Refrigerant Charging Procedure

Steps for charging the system with refrigerant.

Electrical Wiring and Power Supply

Instructions for unit power wiring and supply.

Refrigerant Piping

Guidelines and procedures for installing refrigerant lines.

System Pre-Start Procedure

Safety Controls

Description of various safety controls in the unit.

System Start Procedure Electro Mechanical Controls

System Start Procedure ReliaTel™ Controls

Service Test Modes ReliaTel™ Controls

Trouble Shooting ReliaTel™ Controls

System Status Checkout Procedure

How to check system status and diagnose failures.

Maintenance