Do you have a question about the Transtecno CM 050 and is the answer not in the manual?
Warning about rotating, exposed, or hot parts causing injury or death; emphasizes trained personnel and safety regulations.
Improper use or failure to follow instructions can cause serious damage or death.
Lists critical applications like multipliers, winches, dangerous environments, unusual positions, pressures, or aggressive chemicals.
Check shaft/flange tolerances, clean, apply anti-oxidant, ensure key fit, use quality motors, check output shaft rotation.
Instructions for ITH, ITB, ITS series: check tolerances, clean, apply anti-oxidant; insert joint, couple motor, tighten screws.
Use lubricants for fitting, avoid hammering, use mounting tools, heat components if needed, balance rotating parts over 1400rpm.
Use anti-corrosion lubricants for hollow shafts, avoid hammering, use mounting tools, adhere to load limits.
Assembly kit for ATS, ITS, ITB hollow shafts; requires observing length X from table and following specific steps.
Dismantling kit for ATS, ITS, ITB hollow shafts, using circlip seats; requires observing length X from table.
Torque arm assembly for ATS and ITS shaft-mounted gearmotors; use kit, observe washer thicknesses, screw types, and distance.
Shrink disk assembly for ATS, ITB, ITS output; degrease parts, loosen screws, insert shaft, tighten incrementally.
Lists recommended lubricants for various gearmotor series and VAM series.
Provides oil quantities for various gearmotor series (CMG, CMB, ATS, CM, PG, PU-PX, FT, KFT, CL, CWT, RH, VAM, ITH, ITS).
Troubleshooting table for common problems like motor not starting, high current, high temperature, incorrect speed/rotation, vibrations.
Maintenance intervals (3000h/6mo, 10000h) and checks: noise, leaks, oil level, breather plug, surfaces, torque arm bushes, safety covers.
Procedure for oil change: safety, instructions, intervals, plug positions, container, unscrewing plugs, emptying oil, refilling.
Lists Transtecno gearmotors available with ATEX compliance (Group II, Cat 3G/3D); check nameplate and documentation.
ATEX installation checks: no paint damage, no packaging residue, no corrosion/leaks, clear nameplate, legible documentation.
ATEX maintenance: clean surfaces, repaint if necessary, paint thickness/composition limits, re-grease connections, check leaks.
| Brand | Transtecno |
|---|---|
| Model | CM 050 |
| Category | Engine |
| Language | English |