EasyManua.ls Logo

Trek CHECKPOINT SL - Brake;shift routing - mechanical

Trek CHECKPOINT SL
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2022 Checkpoint SL/SLR
2
Brake/shift routing — mechanical
1
2
3
4
5
2-3Nm
6.5Nm
max
6
7
8
9
NOTE: Tighten the front derailleur
bolt (5) to the manufacturer’s
specications.
1
Rear derailleur hanger — W524188
2
Rear derailleur hanger bolts — W524884
3
Housing grommets — W330578
4
Front derailleur washerW531901
5
Front derailleur bolt — W543903
6
Front derailleur cable
7
Rear derailleur cable
8
Front brake hose
9
Rear brake hose
10
Dropper post cable
Route the brake hoses
1. Connect the calipers to the brake hoses.
2. Route the rear brake hose through the grommet (3).
Route both brake hoses as shown.
3. Attach the calipers to the chainstay and fork. Do not
fully torque the mounting bolts until the calipers are
aligned correctly.

Related product manuals