4 IQ422, IQ4NC/00, IQ4NC/12 Controllers Installation Instructions - Mounting TG201264 Issue 12, 04-Feb-2020. Applies to v4.30.
IQ422, IQ4NC/00, IQ4NC/12 Installation Instructions - Mounting
6
Connect Power
7
Connect Ethernet (if required)
Standard Ethernet cable
(Cat 5e twisted pair)
RJ45RJ45
Hub / Switch
Router
maximum 100 m (109 yds)
3 INSTALLATION (continued)
Trend Ethernet Products Engineering
Guide (TE200369)
Terminal size: 0.14 to 2.5 mm
2
(22 to 12 AWG)
Terminal screw torque: 0.45 to 0.62 Nm (4 to 5.5 lb.in).
Power supply cable must have maximum operating
temperature of at least 80°C (176°F). For UL rating the input
power connections must be made using 18 AWG or larger wire
rated at least 90ºC (194ºF).
This equipment must be earthed (grounded).
/230 230 Vac ±10% 50/60 Hz at up to 44 VA
The 230 V supply must include a dedicated 5 A fuse complying
with IEC60269 (BS1362) and a suitably rated switch in close
proximity and be clearly marked as the disconnecting device
for the unit. A 5 A circuit breaker with high breaking capacity
may be used as an alternative.
/24VAC 24 Vac ±10% 50/60 Hz at up to 28 VA
The 24 V supply must include a suitably rated switch in close
proximity and be clearly marked as the disconnecting device
for the unit. If one side of the supply transformer’s secondary is
earthed (grounded), it MUST be connected to the controller’s
0V terminal (terminal 2).
Do not position the equipment so that the disconnecting
device is dicult to operate.
O
I
DO NOT SWITCH ON POWER
/24/230
ensure correct polarity
2V30 AC
N
L
123
E N L
5A
24 Vac
24 Vac transformer
(For UL rating use Class 2)
fused
primary