INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
1. Preliminary Instructions:
1. Verify that the \venturi replacement kit is correct
for the model of boiler. See page 1.
2. Turn o electrical power supply to the boiler.
3. Close the manual gas shut o valve to the unit.
4. Remove the front panel of the Instinct by removing
the screw along the bottom edge of the unit. Pull
the bottom of the panel forward and then lift to re-
move the front panel from the unit.
5. Using a voltmeter ensure there is no electrical pow-
er to the boiler by checking for power on the boil-
er’s high voltage terminals L and N.
WARNING
!
ELECTRICAL SHOCK HAZARD
Ensure power to the boiler has been disconnected pri-
or to servicing the unit.
2. Install the Acoustic Foam (supplied);
1. Cut a 7" length of 3" diameter air inlet piping.
2. Insert the 7" pipe into the air inlet adaptor.
NOTICE
The the INSTINCT boiler has a length of acoustic foam al-
ready installed in the air inlet adaptor. DO NOT remove this
3. Insert the length of acoustic foam (supplied),
into the 7" pipe length.
4. Use either a straight coupling or elbow to con-
tinue the air inlet installation. Refer to the Vent
Supplement for full details on the installation of
air and vent pipes.
Fig. 1: Installing the Acoustic Foam
7" Air Inlet
Pipe
Acoustic
Foam
7" Air
Inlet
Pipe
Boiler
Air Inlet
Acoustic
Foam