EasyManua.ls Logo

Triple S 20D - Squeegee Assembly

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
MACHINE PREPARATION
5. CONNECTING THE BATTERY CONNECTOR
After charging the batteries, reconnect the battery connector (2) to the connector of
the machine (1).
6. BATTERY INDICATOR
The battery indicator is a green signal light; it is constantly on when the batteries are
sufficiently charged. The signal light will blink when it is necessary to recharge the
batteries.
7. SQUEEGEE ASSEMBLY
The squeegee is assembled as shown in the figure. The squeegee lever should be in
its up position. Insert the holding pin into the squeegee stud bolt to secure the
squeegee in place. Then fit the squeegee hose into its coupling; the hose should be
located to the right of the lifting cable.

Related product manuals