1276
11. secure the seat's left hand infill panel to the subframe front piece with the
shouldered washer and a new fixing. Tighten the new fixing to 6 Nm.
Perform the following operations:
• Battery Box - Installation
• Side Panels - Installation
• Rear Mudguard - Installation
• Fuel Tank - Installation
• Battery - Installation
• Seat - Installation