EasyManua.ls Logo

Tuft & Needle Adjustable Frame - Preparing the Outer Frame

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Preparing the Outer Frame
Lay the Crossbars (D) and Side Rails (A, B) on
the ground, as shown in the picture.
IMPORTANT:
Ensure the Crossbars are parallel and
roughly 5 ft apart.
Use the labels on the Side Rails to ensure
they are oriented correctly.
Use the Crossbars to determine the
position of the Side Rails.
The Side Rails should be the width of the
Crossbar apart.
2
A
B
D
D
DO NOT REMOVE PROTECTIVE MATERIAL OR
STRAPPING TAPE. USE LABELS ON SIDE RAILS

Related product manuals