Initial operation with Turbelle® driver
Multicontroller 7095 has been designed for the
operation with Turbelle® driver 7240.26 or 7240.27
(1). Elder drivers, such as 240.24, 7240.24 (P) or
7240.25, must not be connected.
Connections
Prior to dis/connecting the connecting cable to the
pump, always disconnect the power supply unit of
the Turbelle® from the mains (2).
One of the ve-pole connecting cables 7092.30
is used to connect Multicontroller 7095 up to the
driver 7240.26 / 7240.27 of Turbelle® electronic or
Turbelle® stream pump, which also supplies the
power.
By means of the Y adapter 7092.34 (4), two pumps
per output can be connected, which means that up
to eight pumps can be operated.
Mise en service avec Driver Turbelle®
Le Multicontroller 7095 est conçu pour une
utilisation avec Driver de pompe Turbelle® 7240.26
ou 7240.27 (1). Les anciens modèles 240.24,
7240.24(P) ou 7240.25 ne peuvent être raccordés.
Raccordements
Avant tout branchement / débranchement d’un câble
de liaison sur le Driver, débranchez l’alimentation
Turbelle® pour une commutation sans charge (2).
Le Multicontroller 7095 se raccorde par le câble de
liaison 5 broches 7092.30 sur un Driver 7240.26
/ 7240.27 de Turbelle® electronic ou Turbelle®
stream, il est ainsi alimenté en courant (3).
Y-Adapter 7092.34 (4) autorise l’utilisation de deux
pompes par sortie et jusqu’à huit pompes en tout.