OPERATION
D
12
3. Land leveling pattern
• The land leveling work may be
performed after crushing soil or not.
• The vehicle speed can be set faster
when performing the land leveling
work with soil crushed already.
• When working in a wet field, fill the
field with a sufficient amount of
water so that the trace of plowing
cannot be seen.
• The border shown in the figure
should be set a little narrower than
two times of one plowing width.
• Refer to the alternating returning
pattern for other details.