LEVELING INFORMATION
NOTICE
Because these units do not have leveling legs, it
is extremely important that they sit on a level
surface. If they are not level, the ice mold will
not fill evenly.
Use a level to confirm
the unit is level. Level
should be placed along
top edge and side edge
as shown.
INSTALLATION
1. Plug in the power/electrical cord.
2. Gently push the unit into position. Be careful not to
entangle the cord and water line.
3. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments.
4. Remove the interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.