ENGLISH
Installation Instructions
Commissioning must be done by profes-
sionally qualied personnel. Unical AG
S.p.A. will not be held liable for damage
to persons, animals or objects due to fail-
ure to comply with the above instruction.
Before commissioning the boiler, check that:
3.10 - COMMISSIONING
does the installation meet the specic standards and regulations in force, both relating to the
gas part as well as the electrical part?
do the combustion air intake and ue gas exhaust take place properly according to
what is dened by the specic rules and regulations in force?
is the fuel supply system sized according to the capacity required by the boiler?
Is it equipped with all safety and control devices required by the standards in force?
is the power supply of the boiler 230V - 50Hz?
has the system been lled with water (approximately 0.8/1 bar pressure on the pressure gauge
with the pump stopped)?
Has the condensation drain trap been lled with water as indicated in chapter 3.7?
are any system shut-o󰀨 gate valves open?
does the gas to be used correspond to the boiler calibration gas?: otherwise, perform the boiler
conversion in order to use the gas available (see section: 4.3”);
this operation must be carried out by technical sta󰀨 qualied in compliance with the standards in force;
is the gas supply valve open?
has the system been checked for gas leaks?
is the outside main switch ON?
is the system safety valve e󰀩cient and is it connected to the drains?
is the condensation drain trap connected to the drains?
has the system been checked for water leaks?
are the ventilation conditions and minimum distances to perform any maintenance
ensured?
have the GAS, HEATING and DOMESTIC HOT WATER pipes been cleaned thoroughly with
products suitable for each circuit?
has a surveillance and protection system against gas leaks been installed? (Optional)
are the system pipes NOT used as the electrical system earthing?
has the system been sized properly bearing in mind the radiator pressure drops?
thermostatic valves, radiator stop valves
has the operator been trained and has the documentation been supplied?
Please tick the operations performed
Switching boiler on and off
NOTE!
Further details in the section
‘Technical Information’’ on the boiler
page of the unicalag.ag website

Other manuals for Unical KONe R 18

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Unical KONe R 18 and is the answer not in the manual?

Unical KONe R 18 Specifications

General IconGeneral
BrandUnical
ModelKONe R 18
CategoryBoiler
LanguageEnglish

Related product manuals