EasyManuals Logo

Uniden 2020 User Manual

Uniden 2020
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
UNIDEN 2020
Sid 12 (26)
POWER SUPPLY ALIGNMENT
1. AVR UNIT (PC-082) ALIGNMENT.
1-1. Test Equipment Required
(1) DC Voltage Meter.
1-2. Voltage Measurement and Adjustment.
(1) 8.2V DC Power Source:
Connect DC Voltage meter to Pin 3 of J651, and adjust potentiometer
R659 to get 8.2V ±0.2V of meter readings.
(2) 6V DC Power Source:
Connect the meter to Pin 5 of J651, and check that the meter reading
indicates within 5.5 6.5V.
This process should be made after completion of (1) as mentioned above.
(3) 5V DC Power Source:
Connect the meter to Pin 9 of J651 and adjust potentiometer R653 to get
5V +0.2 - 0.1V of meter readings.
(4) R.I.T Power Source:
Connect the DC meter to Pin 6 of J651 and adjust potentiometer R662 to
get 1.3V ±0.1V of meter readings.

Other manuals for Uniden 2020

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Uniden 2020 and is the answer not in the manual?

Uniden 2020 Specifications

General IconGeneral
BrandUniden
Model2020
CategoryTransceiver
LanguageEnglish

Related product manuals