3. Fully insert the rectier by pushing the handle towards the shelf. The rectier handle will
rise up and lock the rectier into the position, Figure 4-20 #2.
4. Repeat steps 1 to 3 if more rectiers are to be installed.
2
Figure 4-20 Rectier Installation
4.13 Reinstalling Top Cover
After completing all connections, reinstall the top cover if the Rear and Top Cover Kit is
ordered.
1. Place the top cover on the top of the Distribution Unit. Make sure that the to cover and
Distribution Unit are matched well.
2. Install the front panel of Distribution Unit so that the top cover is xed and unremovable.
3. If the Extended Rear and Top Cover Kit is ordered, reinstall the AC input cover on the
back of the unit.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Unipower Guardian Access 3U and is the answer not in the manual?

Unipower Guardian Access 3U Specifications

General IconGeneral
BrandUnipower
ModelGuardian Access 3U
CategoryPower Supply
LanguageEnglish

Related product manuals