EasyManua.ls Logo

V2 STARK6 - Page 18

V2 STARK6
64 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
- 16 -
INSTALLATION MEASURES
To carry out a proper installation of the operator parts as well as
to ensure the best automation performance, the measurement
levels shown in the following table shall be complied with.
Change the gate structure to adapt it to one of the cases in the
table, if necessary.
CAUTION: Failure to comply with the bracket installation
distances may lead to automation operation faults, such as:
- Cyclical movements and accelerations at some positions
of the stroke.
- Increased motor noise.
- Limited opening, or no opening at all (in case of
counterlever fixed motor).
A
E
D (945mm)
g
E [mm] A [mm]
90°
80 125
90 130
100 150
110 160
120 160
130 165
140 170
150 165
160 170
170 180
180 180
190 180
200 175
210 175
220 170
g
E [mm] A [mm]
220 170
230 155
240 150
250 160
260 150
270 145
280 140
290 135
300 135
310 125
320 125
330 120
340 115

Other manuals for V2 STARK6

Related product manuals