EasyManua.ls Logo

V2 STARK6 - Page 19

V2 STARK6
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
- 17 -
Before it can be fixed to the wall, the bracket must be welded to
the fastening plate (Fig. 3); the bracket may be cut to the desired
length, adjusting distances A and E accordingly
NOTE - The bracket supplied with the gearmotor is 180 mm
long
m WARNING! Before fixing the rear bracket, make sure
that the front bracket will be fixed to a solid position of
the gate leaf; the front bracket will have to be secured at a
different height than the rear bracket (Fig. 4).
28 mm
Fix the bracket in place using suitable plugs, screws and washers
(not supplied)
INSTALLATION OF THE FRONT FIXING
BRACKET
1. For the installation of the front bracket to the gate leaf, refer
to distance D (fig. 2).
2. Define the front bracket installation height in accordance with
fig. 4.
3. Fix the bracket to the solid section of the gate leaf.
FIG.3
FIG.4
g
E [mm] A [mm]
100°
80 140
90 150
100 155
110 155
120 170
130 180
140 190
150 195
160 195
170 190
180 190
190 180
200 180
210 180
220 175
230 170
240 170
250 165
260 160
270 160
280 160
290 160
300 160
g
E [mm] A [mm]
110°
90 160
100 170
110 180
120 195
130 200
140 200
150 195
160 195
170 195
180 195
190 190
200 190
210 190
220 185
230 185
240 185
250 190

Other manuals for V2 STARK6

Related product manuals