7
Cases Activation R2
* Abbreviations are explained in Table 1 ( see p.8 ) .
Enabling first implemented 2 when S2 <MST-DAS.
Enabling a second application 3 when the S3 <MST-DAS.
! Caution : In applications 2 & 3 have control auxiliary source , the message << AUX >> should
be << ON >>.
3rd Enabling Implementation 4 when (S3-S2) ≥ DTS & S3 ≥ MCT when the elapsed time of the
delay parameter CPD.
4th Enabling Implementation 4 when S3 ≤ FPC frost protection panels. The process of opening
and closing operation of R2 is a time (120 sec) by repeating S3> FPC.
5th Enabling Implementation 4 when S3 ≥ MTC overheat protection panels. The R2 will be dis-
abled when S3 <MTC at 3 ° C or HST = MTC.
Operation:
The device V-DCS3 the time to be fed with electricity constantly performs checks proper func-
tioning sensory outputs and relay contacts are available . The green screen background after
10 sec disappears , comes back with the click of one of the three buttons .
Cases Trigger R1
* Abbreviations are explained in Table 1 ( see p.8 ) .
It is activated when the first (S1-S2) ≥ DTS & S1 ≥ MCT applies to all applications when the
elapsed time of the delay parameter CPD.
Enabling second when S1 ≤ FPC frost protection panels apply to all applications. The process
of opening and closing operation of R1 is a time (120 sec) by repeating S1> FPC.
Enabling third when S1 ≥ MTC overheat protection panels apply to all applications. The R1 will
be disabled when S1 <MTC at 3 ° C or HST = MTC.