current ETCI rules. The boiler must be mounted on a flat wall, which is sufficiently robust to take
its total weight, see boiler specifications 2.1.
4.1.2 Clearances
The boiler should be positioned so that at least the minimum operational and servicing
clearances are provided, see fig 4.1.
Fig. 4.1 Distance during installation