EasyManua.ls Logo

Vaillant ecoTEC VUW - Page 16

Vaillant ecoTEC VUW
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
16 Installation and maintenance instructions ecoTEC 0020173113_01
4
The position of the connections.
The position of the wall breakthrough of the air/flue gas
duct.
Position the installation template vertically over the instal-
lation site.
> Attach the template to the wall, using tacks for example.
> Mark the drill holes for the hanging bracket on the wall.
> If necessary, mark the position for the wall breakthrough
for the air/flue gas duct.
> Remove the installation template from the wall.
> Drill 2 holes
Æ 10 mm for the hanging bracket in the wall.
> If necessary, cut the wall breakthrough for the air/flue
gas duct.

Table of Contents

Related product manuals