EasyManua.ls Logo

Valley Classic - Percent Timer Setting Calculation Worksheet

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
Valley Classic Control Panel
Operation
Percent Timer Setting Calculation Worksheet
1. Determine Machine Length.
SL = __________ feet SL = __________ Meters
2. Determine the End Tower Rotational Speed at 100% Timer Setting.
Speed = __________ ft/min Speed = __________ M/min
3. Determine Inches (millimeters) Per Day the machine will apply.
Inches Per = (GPM) (735.3) Millimeters Per = (LPS) (735.3)
___________ ___________
Day (SL)
2
Day
(SL)
2
= ( ) (735.3) = ( ) (735.3)
_____________ _____________
( )
2
( )
2
= ( ) = ( )
________ ________
( ) ( )
= _______ = _______
4. Determine Hours Per Revolution at 100 Percent Timer Setting.
Hours Per = (0.105) (DLRDU in ft) Hours Per = (0.105) (DLRDU in M)
_________________ _________________
Revolution (Speed in ft/min) Revolution (Speed in M/min)
at 100% = (0.105) ( ) at 100% = (0.105) ( )
_____________ _____________
( ) ( )
= ( ) = ( )
________ ________
( ) ( )
= _______ = _______
5. Determine Inches (millimeters) Per Revolution at 100 Percent Timer Setting.
Inches per =
(Hours/Revolution) (In/Day)
Millimeters per =
(Hours/Revolution) (mm/Day)
____________________ ____________________
Revolution
24 Revolution 24
at 100% = ( ) ( ) at 100% = ( ) ( )
_______________ _______________
24 24
= ( ) = ( )
________ ________
24 24
= _______ = _______