19 - Standby
20 - Roughing Sniffer Probe
21 - Sniffer Mode Leak Testing
{ States 22 - 25 are for Sniffer Mode, Manual-Ranging}
22 - Standby
23 - Standby
24 - Roughing Sniffer Probe
25 - Sniffer Mode Leak Testing
26 — 36 - Automatic Tuning
37 — 42 - Checking Calibration
43 - Service Mode
In software revisions 3.9 and later, the numbers have changed due to the addition
of 2 more states. (‘I’ + 2 numbers).
00 - First Power
01 - Power Up
02 - Power Up
03 - Power Up
{ States 4 - 11 are for Vacuum Mode, Auto-Ranging}
04 - Standby
05 - Standby
06 - Roughing Testport
07 - Gross Mode Leak Testing
08 - Reverse Rough Close Delay
09 - Reverse Mode Leak Testing
10 - Direct Rough Close Delay
11 - Direct Mode Fine Leak Testing
{ States 12 - 19 are for Vacuum Mode, Manual-Ranging}
12 - Standby
13 - Standby
14 - Roughing Testport
15 - Gross Mode Leak Testing
16 - Reverse Rough Close Delay
17 - Reverse Mode Leak Testing
18 - Direct Rough Close Delay
19 - Direct Mode Leak Testing
{ States 20 - 23 are for Sniffer Mode, Auto-Ranging}
20 - Standby
21 - Standby
1109-186-00 Rev. C d-iv