EasyManua.ls Logo

Veeder-Root SERIES 7887 - Page 14

Veeder-Root SERIES 7887
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation,
Operation
and
Service
Manual
Series
7886
High-Capacity
&
7887
Meter
Registers
6.
Right-Hand
Side
Plate
Installation
a.
Hold
meter
register
assembly
as
shown
in
Figure
22
and
place
a
rubber
band
around
the
assembly
to
hold
it
together.
Be
sure
the
pin
in
the
reset
lever
group
remains
engaged
in
the
slot
in
the
reset
arm.
b.
Install
side
plate
over
wheel
shaft
first,
then
engage
the
other
shafts.
c.
Temporarily
secure
the
side
plate to
the
rear
mounting
bar
with
screws.
7.
Bracket
Group
(if
required)
and
Totalizer
Installation.
a.
If
required,
install
new
bracket
group
to
inside
of
left
side
frame
and
secure
with
two
screws
and
lock-
washers.
See
Figure
31.
b.
Install
pointer
with
screw
(saved
from
old
totalizer)
onto
new
totalizer
group
but
do
not
tighten
screw
securely.
Pointer
position
must
be
adjusted
after
totalizer
group
is
installed.
See
Paragraph
F,
2.
c.
Install
the
totalizer
group
so
that
the
bevel
gear
is
in
mesh
with
the
top
bevel
gear
on
the
bracket
group
and
secure
with
retaining
screws.
For
adjustment
of
bevel
gear
drive,
see
Paragraph
E,
5.
8.
Spring
Installation.
a.
See
Figure
23
for
identification
of
springs.
\,
b.
Install
the
five
anti-topping
finger
springs
between
the
anti-topping
fingers
and
the
stop
shaft.
See
Figure
24.
c.
Install
the
reset
spring
between
the
reset
lever
and
the
pinion
shaft.
d.
Install
the detent
spring
between
the
detent
lever
group
and
the
stop
shaft.
e.
Install
the
clutch
spring
between
the
clutch
lever
group
and
the
pinion
shaft.
9.
Pinion
Shaft
Assembly
Installation
a.
If
not
previously
accomplished,
remove
all
parts
from
pinion
shaft.
b.
Rotate
wheel
shaft
so
reset
fingers
are
fully
engaged
in
the
heart-shaped
cams
on
each
wheel.
c.
Place
pinions,
with
short
finger
up,
in
between
each
wheel
as
shown
in
Figure
25.
d.
Install
the
end
of
the
shaft
closest
to
the
two
retaining
ring
slots
into
the
left-hand
side
plate
and
through
each
pinion.
Figure
20.
Reset
Finger
Shaft
Group
Preparation
For
Installation.
Figure
22.
Preparation
For
Side
Plate
Installation.
y
_
Figure
21.
Reset
Lever
Group
Pin
Engagement.
12
Figure
23.
Spring
Identification.

Related product manuals