EasyManua.ls Logo

Veeder-Root SERIES 7887 - Final Checks and Adjustments

Veeder-Root SERIES 7887
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation,
Operation
and
Service
Manual
Series
7886
High-Capacity
&
7887
Meter
Registers
e.
Install
washers
and
detent
lever
group
onto
shaft
and
engage
shutter
with
tab
on
detent
lever.
f.
Push
shaft
through
the
right-hand
side
plate
and
secure
with
washer
and
retaining
ring.
g.
Secure
detent
lever
group
into
position
with
retaining
rings.
h.
After
assembly,
rotate
wheel
shaft
to
make
sure
all
pinions
have been
positioned
properly.
If
binding
occurs,
reposition
pinions
per
step
c.
10.
Reset
Gear
Installation.
a.
Install
reset
gear
on
wheel
shaft,
aligning
orientation
mark
made
at
disassembly.
b.
Secure
gear
to
shaft
with
pin.
11.
Reset
Idler
Gear
Installation.
a.
If
present,
install
reset
idler
gear
on
the
reset
idler
gear
shaft.
See
Figure
8.
b.
Secure
with
retaining
ring.
Note:
This
gear
will
be
timed
when
the
meter
duplicator
and
meter
register
are
assembled
together.
Figure
24.
Anti-Topping
Finger
Spring
Installation.
Figure
26.
Installation
Of
Meter
Register
Onto
Mounting
Fixture.
Figure
25.
Pinion
Positioning.
Figure
27.
Securing
Mounting
Fixture.
13

Related product manuals