ISD Alarm Message Diagnostics DEGRD PRESSURE
10
DEGRD PRESSURE
A degradation over-pressure failure occurs when the 75th percentile of 30-days’ ullage pressure data exceeds the
degradation over-pressure requirement. That means the pressure is greater than 0.3"wc for more than 6 hrs a day
on average or more than 7.5 days for 30 days.
ISD MONITORING CATEGORY
Vapor Containment Monitoring as implemented by over-pressurization and Vapor Leakage Detection tests, is
responsible for ensuring that UST ullage pressure and system leak rate stay within regulatory boundaries. The
Vapor Leakage Detection test will check all components for leaks including: P/V valves, dispenser piping, vacuum
assist motors, nozzles, hoses, breakaways, vapor processor piping and elements as well as any other piping and
fitting or component connected into the UST ullage space.
DIAGNOSTIC PROCEDURE
Perform an operability test on the pressure sensor to ensure the ISD system is not causing the fault. See ISD
Setup & Operation Manual in Related Manuals.
COMMON CAUSES
• See ISD Gross Pressure (page 9)
• Refer to the Clear Test Repair Menu (on page 36) for clearing this alarm on the TLS after repairs are complete.
FIELD NOTES
1. Check that the EVR fittings are tight in the dispenser (see ISD GROSS PRESSURE, Field Note 1 on page
9).