EasyManua.ls Logo

VER-MAC ST-4815G3 - Arrowboard Controller Maintenance

VER-MAC ST-4815G3
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Solar Panel(s)
Ver-Mac 2019 Arrowboard Operation, Safety and Maintenance Manual - 1 25
Item
Function Required
Before Every
Use
3 Months
12
Months
Solar panel
Glass Surface
Do not rely exclusively on the rain to
clean the solar panel.
Clean upper glass surface using plenty
of water.
•
•
In winter, remove snow or ice build-up
as soon as possible.
Sunlight usually melts any light snow
or ice.
•
•
Inspect for damage.
•
•
•
Electrical
Junction
Boxes
Open junction box and use a volt meter
to test and monitor output.
•
All Connectors
Check for tightness.
•
Cables or
Wiring
Check for wear, frays, breaks.
•
5.13.1 Replacement Solar Panel
Electrical current is always present.
Solar panels can produce an electrical shock or burn unless sufficient care is
taken.
If you suspect a problem with the solar panel itself, test the panel output using a multimeter.
Before testing you must make sure of the following:
The panel is in full sunlight.
The controller module is OFF.
The solar regulator is OFF.
Replacement solar panels must be the same wattage and ideally, from the same
manufacturer as initially installed in Ver-Mac’s factory.

Table of Contents