EasyManua.ls Logo

Vertiv Liebert DSE Packaged Series - Page 65

Vertiv Liebert DSE Packaged Series
105 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Condenser
c
Clean coils.
c
Fans are free of debris.
c
Fans are security mounted.
c
Motor bearings are in good condition.
c
Check all refrigerant lines for vibration isolation. Support as necessary.
c
Check for refrigerant leaks.
c
Check the status indicator lights of surge protection device (if installed).
c
Check/re-torque wire connections.
c
Check contactors for pitting. Replace if pitted.
c
Verify the operation sequence/set points.
c
Charge verification:
a. Outdoor ambient temperature ____________________
b. Subcooling __________________
c. Indoor unit return air temperature ________________
d. Sight glass level (if Lee-Temp or pumped refrigerant) __________________
c
Motor amp draw
#1 L1 _______________ L2 ______________ L3 _______________
#2 L1 _______________ L2 ______________ L3 _______________
#3 L1 _______________ L2 ______________ L3 _______________
#4 L1 _______________ L2 ______________ L3 _______________
#5 L1 _______________ L2 ______________ L3 _______________
#6 L1 _______________ L2 ______________ L3 _______________
#7 L1 _______________ L2 ______________ L3 _______________
#8 L1 _______________ L2 ______________ L3 _______________
#9 L1 _______________ L2 ______________ L3 _______________
#10 L1 _______________ L2 ______________ L3 _______________
#11 L1 _______________ L2 ______________ L3 _______________
#12 L1 _______________ L2 ______________ L3 _______________
Pumped Refrigerant Economizer
c
Check for refrigerant leaks.
c
Check/re-torque wire connections.
c
Check contactors for pitting. Replace if pitted.
c
Check pump mounting.
9 Preventive Maintenance Checklist
61

Table of Contents

Related product manuals