TABLE OF CONTENTS
1 Product Overview 5
2 Installing the Liebert SiteLink-E Module 7
2.1 Preparations for Mounting the Module 7
2.1.1 Choose a Location to Install the Liebert SiteLink-E 7
2.2 Enclosure Diagrams 7
3 Connect Input Power Wiring 11
3.1 Power Wiring 11
3.1.1 Input Power Requirements 11
3.2 Connect Input Power—AC or DC 11
4 Communication and Control Wiring 13
4.1 IGM Communication 13
4.1.1 Wiring IGM Ports 13
4.2 RS-485 and ARC156 Wiring Considerations 14
4.3 Wiring for BACnet/ARC156 Network 15
4.4 Wiring Port S1 16
4.4.1 Wiring Port S1 for RS-485 Network—Four-Wire 16
4.4.2 Wiring Port S1 for RS-485—Two-Wire 17
4.4.3 Wiring Port S1 for RS-232 18
4.5 Wiring a Modem for Half-Router Communication—Port S1 19
5 Specifications 21
Appendices 23
Appendix A: Communication Protocol and Wiring Considerations 23
Vertiv | Liebert® SiteLink-E™ Installation Manual | 3