SYSTEM OPERATING PROCEDURES
NCU Controller Operating Procedures
General
NOTE!
For general operation instructions, refer to the NCU Controller User Manual (UM1M830BNA).
This system uses a special NCU configuration which allows intuitive naming of the bays and distribution
elements. The NCU User Manual documents the names found in a standard NCU configuration. This section
describes the differences in the NCU naming convention used in this special configuration as compared to a
standard NCU configuration.
NCU Numbering Scheme
The NCU identifies (numbers) the components of the system as detailed in Table 1.
Table 1:
NCU Numbering Scheme
Component
NCU Identification Number
NCU Numbering
Scheme
Notes Example
Bay Bay #
Primary Bay is #1, other bays are
numbered consecutively, following the
bay-to-bay cabling scheme.
1
Second Bay
2
Fifth Bay
5
Rectifier NCU Rectifier ID#
Rectifiers are identified as they are
powered-up and recognized by the
NCU.
First Recognized Rectifier
Rectifier 1
Tenth Recognized Rectifier
Rectifier 10
Distribution
Bus (Power/
Distribution
Bays and
Distribution
Only Bays)
Bay #
Top or Bottom
Distribution
Note: Bottom
distribution only
available in the
distribution only
bays.
Primary Bay is #1, other bays are
numbered consecutively, following the
bay-to-bay cabling scheme.
Primary Bay, Top Bus
Bay 1 Top Dist
Second Bay, Bottom Bus
Bay 2 Bottom Dist
Fifth Bay, Top Bus
Bay 5 Top Dist
Distribution
Device
(Power/
Distribution
Bays and
Distribution
Only Bays)
Load
Bay #
Distribution Point
# within Bay
Primary Bay is #1, other bays are
numbered consecutively, following the
bay-to-bay cabling scheme.
Distribution Point =
1-24 (left - right, Top Bus, Bus #1).
25-36 (left - right, Bottom Bus, Bus #2).
Note that distribution components may
take more than one mounting position,
designation number is the left most
mounting position.
Primary Bay, Circuit Breaker
Mounted in Position One
Load 1-1
Second Bay, Fuse Mounted in
Position Sixteen
Load 2-16
Fifth Bay, Plug-In Mounted in
Position Twenty-Six
Load 5-26