TABLE OF CONTENTS
Safety Precautions 1
1 Vertiv™ VRC 3
1.1 Model Nomenclature 5
1.2 Specifications 5
1.2.1 Cooling Capacity 6
2 Equipment Inspection and Handling 7
2.1 Handling the Packaged Unit 8
2.1.1 Storing the Packaged Unit 9
2.2 Unpacking the Unit 9
3 Pre-installation Preparation 11
3.1 Cabinet and Room Requirements 11
3.2 Environmental Requirements 11
3.3 Clearance Requirements 12
3.4 Mounting, Ducting, Drain and Electrical-connection Considerations 12
4 Installation 13
4.1 Mounting the Unit in the Cabinet 13
4.2 Connecting Duct Work 15
4.3 Connecting the Condensate-drain Piping 16
4.4 Connecting Supply Power 17
4.5 Monitoring and Display Connections 18
5 Using the Controller and Display 21
5.1 Display Screens 21
5.1.1 Normal Screen 22
5.1.2 Entering Password and Menu 22
5.1.3 Alarm Screens 23
5.1.4 Temperature Settings Screen 25
5.1.5 System Status Screens 25
5.1.6 Help Screens 26
6 Regular and Preventive Maintenance 29
6.1 Cleaning and Replacing the Filters 29
7 Troubleshooting 33
Appendices 35
Appendix A: Checklist for Completed Installation 35
Appendix B: Preventive Maintenance Checklist 37
Vertiv | VRC Installer/User Guide | iii