EasyManua.ls Logo

VEVOR 5807 - Page 6

VEVOR 5807
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 5 -
Important Note:
If the top of your trailer's side rail is made of round tubing larger than 2
inches in diameter, you will need longer mounting bolts before beginning
the installation process. Alternatively, you can spot-weld the Lift on the
side rails instead of using mounting bolts. When mounting the Lift, ensure
that your housings are straight, level, and flush to ensure proper
installation.
Assembly and Use
STEP 1. INSTALLING THE HOUSING A AND THE HOUSING B
1) Mark the hole positions of bolts before installing bolts.
Place and align housing A & housing B on top of the trailer's side rail.
Notice the direction of the housing in Figure 1-0.

Related product manuals