Installing this industrial chiller is very simple.
The first installation of a new machine can be carried out by following these
steps:
①.OPEN THE PACKAGE TO CHECK IF THE
MACHINE IS FIXED AND ALL NECESSARY
ACCESSORIES ARE COMPLETE.
②.OPEN THE WATER SUPPLY INLET TO SUPPLY
COOLING WATER (DON'T SPILL THE WATER
OUT!).
Observe the water level gauge and add water slowly,
taking care not to let the water overflow! For the
cooling of carbon steel equipment, an appropriate
amount of cooling water additive (anti-corrosion water
aqua) should be added to the water. Users in cold
regions should use non-corrosive antifreeze.
③
.CONNECT THE INLET AND OUTLET PIPES
ACCORDING TO THE SYSTEM CONDITIONS.
④
.PLUG THE POWER CORD INTO THE POWER SUPPLY AND TURN
ON THE COOLER.
The pump will work after turning on the chiller for the first time. There will
be a lot of air bubbles inside the water pipes that will occasionally make the
alarm work. After a few minutes of use, the chiller will work normally.
Please check the water pipes and connecting joints to ensure that the leak
is not available.