Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Opening the heat pump..................................................................................................... 61
•
2. Compiling reports.............................................................................................................. 61
•
3. Purging the refrigerant lines and indoor unit.................................................................. 61
•
4. Checking the refrigerant lines for leaks........................................................................... 61
•
5. Evacuating the refrigerant lines and indoor unit............................................................ 62
•
6. Charging the refrigerant lines and indoor unit................................................................ 63
• • •
7. Checking the refrigerant circuit for leaks........................................................................ 64
•
8. Filling and venting the secondary side............................................................................ 65
• • •
9. Checking the expansion vessel and heating circuit pressure....................................... 65
• •
10. Checking the indoor unit electrical connections for firm seating
• • •
11. Checking the fan in the outdoor unit can run freely....................................................... 66
•
12. Cleaning the outdoor unit heat exchanger (evaporator)................................................ 66
•
13. Checking the thermal insulation of flared connections
• •
14. Checking the outdoor unit electrical connections for firm seating............................... 67
• • •
15. Closing the heat pump....................................................................................................... 67
• • •
16. Switching on the power supply........................................................................................ 67
• • •
17. Starting the heat pump...................................................................................................... 67
•
18. Commissioning the system............................................................................................... 67
• • •
19. Checking the heat pump for noise................................................................................... 79
• • •
20. Checking the system function.......................................................................................... 79
•
21. Instructing the system user.............................................................................................. 80
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance