3
5608 488 v1.2
Vitocell 100-B Installation Instructions
Contents
Safety, Installation and Warranty Requirements..............2
Licensed professional heating contractor.....................2
Product documentation.............................................2
Advice to owner......................................................2
Warranty................................................................2
Important Regulatory and Installation Requirements........4
Codes.....................................................................4
Mechanical room.....................................................4
Working on the equipment........................................4
Technical literature..................................................4
About These Instructions.............................................5
Product Information.....................................................5
79 USG to 120 USG (300 L to 450 L) capacity..........5
Tank Connections.......................................................6
Tank Set-up...............................................................7
79 USG (300 Liter) Tank Installation............................8
Thermal insulation and thermometer Installation..........8
Temperature sensor installation for solar operation......8
Temperature sensor installation (when using
a Vitotronic 200 / 300 or Vitodens 200).....................9
Checking the anode connection...............................10
120 USG (450 Liter) Tank Installation.........................10
Thermal insulation and thermometer installation........10
Temperature sensor installation for solar operation....11
Temperature sensor installation (when using
a Vitotronic 200 / 300 or Vitodens 200)...................11
Fitting the thermal insulation jacket..........................12
Fitting the thermometer and thermometer sensor
(if supplied) and covers...........................................13
Aquastat installation (when using a Vitotronic 100)............14
Grounding connection.............................................14
Boiler Water Connections (heat exchanger connection)...15
Recommended piping with solar application with
individual DHW tank...............................................15
Domestic Water Connections......................................16
Pressure Drop Information..........................................18
Installation of Inspection Front Opening.......................19
Post Installation.......................................................19
Service binder........................................................19
Start-up information...............................................19
Introduction
Safety
General Information
Set-up and Connections
Additional Information
Page