EasyManuals Logo

ViscoTec preeflow plug n dose User Manual

ViscoTec preeflow plug n dose
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
12 / 16 INST-002766 / Aplug´n´dose
5 Maintenance
In the event of a fault, or if there is any doubt that the machine/system is not
completely ready for operation, it must be shut down immediately and inspected by
competent maintenance staff before operation continues.
5.1 Maintenance intervals
In order to ensure problem-free operation, we recommend complying with the following
maintenance intervals.
1 = Operating staff
2 = Maintenance staff
5.2 Troubleshooting
If you have any questions about commissioning, maintenance, repairs or ways to optimise
your processes, our Service employees will be happy to help.
You can reach us at: support@preeflow.com
We will respond to your service enquiry in German or English.
WARNING
Maintenance and cleaning work may only be carried out when the machine has been shut
down safely and secured against unauthorised restarting. Otherwise, serious injuries may
result.
Switch off the master control unit
Disconnect the cable to the master control unit (B)
When Activity Who
Start of shift/daily Visual check for leaks / contamination / damage. 1
Fault Possible cause Action
Dosing control unit
cannot be operated,
LED flashing, fault
signal is output (PIN 3)
Overcurrent shutdown Clean the dispenser, if
necessary replace the stator.
See dispenser operation and
maintenance manual
Faulty motor
MAINTENANCE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ViscoTec preeflow plug n dose and is the answer not in the manual?

ViscoTec preeflow plug n dose Specifications

General IconGeneral
BrandViscoTec
Modelpreeflow plug n dose
CategoryControl Unit
LanguageEnglish

Related product manuals