EasyManuals Logo

Vivax ACP-09CH25AEF User Manual

Vivax ACP-09CH25AEF
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
22
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valves service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge indicates
0.05 to 0.1Mpa.
If the pressure when the air conditioner is not running is higher than 0.1Mpa, discharge the
refrigerant until the gauge indicates 0.05 to 0.1 Mpa. Discharge the refrigeration gradually; if it is
discharged too suddenly, the refrigeration oil will be discharged.
6.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge sets centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
PDF 件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vivax ACP-09CH25AEF and is the answer not in the manual?

Vivax ACP-09CH25AEF Specifications

General IconGeneral
BrandVivax
ModelACP-09CH25AEF
CategoryAir Conditioner
LanguageEnglish

Related product manuals