13
A. B.Insert a T-Joiner at the top of each Lower Frame Tube.
Ensure that they’re positioned at 45° angles, facing
outwards.
Slide both T-Joiner and Lower Frame Tube pairs into
the bottom of the Upper Frame Tubes to complete the
climbing frame section.
CONTINUE TO STEP 14 FOR MEDIUM
A.
B.
Connect a Large T-Joiner to the larger end
of a Large Top Rail, and connect a T-Joiner
into the other.
Repeat for the 1 remaining Large Top Rail.
7
STEP
MEDIUM:
8
STEP
LARGE: